See the notes from the Combined L1Calo+Tile+Larg calibration workshop for a to-do list.
Continuity Patterns
Need Athena software to analyze these runs
PMT Scans
Need Athena software that will update Tile channel status DB
Physics run (with beam) where D-cell calibration is nominal
Noise run * Need a run with all PMTs and then a sweep of each PMT
Energy scan
Cross-talk run * Pulsing all towers except a few random towers not pulsing
L1Calo/Tile Calibration Issues
Athena algorithms that search for bad PMTs in 'PMT scans'
Determine the maximum intensity that the laser can be operated in the long gap
Get the extended CisPar fragment working in TDAQ
Access to Metadata (CisPar fragment)
Tile Trigger Pulse Overshoot Problem
Possible problem: Amplifier goes into saturation, looses feedback and then starts operating in a non-linear fashion. Possible solutions: Choose a different amplifier or put in a clamping diode in feedback
List of talks with more information