SBIR Meeting, May 18, 2007

Introduction

  • Coordinates: 1-510-665-5437 #1122
  • Attending: Rob, Paul, Suchandra
  • Last meeting: NotesMay4

From last meeting

  • Paul has the back-off working in ODE if calls are taking too long; based on time for reponse, or if calls are piling up.
  • Using mock objects for the Globus pieces.
  • Will connect to ws-gram endpoints over the weekend.
  • By Monday get a 'gram hit' - successful exercise of java submit code with ws-gram service.
  • Get uct3 account for Paul
  • Setup SVN package for ODE integration code
  • Setup a page describing the uct3 resource information that Paul needs.

Meeting notes

  • Paul - will discuss problems with Stu getting java call-out piece - getting a handle on the lifecycle.
  • Command line scripts from Suchandra working fine.
  • Lots of bits and pieces - want to get the WS gram container working as a peer with the Java container on the same VM, so that ODE can work as a client.
  • Pre-fab XML job description payloads would be useful - Suchandra will provide these.
  • Suchandra will get a uct3 account setup for Paul.

AOB

  • None

-- RobGardner - 18 May 2007

This topic: SBIR > WebHome > NotesMay18
Topic revision: 18 May 2007, RobGardner
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback